HC Page1 Fill: 851 E: 450 GeV 20-11-2009 17:58:33
BEAM SETUP: INJECT AND DUMP
BCT T12: 4.4e+09 BCT T18: 0.00e+00 I(B1): 0.00E00 I(B2): 0.00E00
TED T12 position: DUMP TED T18 position: DUMP
TDI P2 gaps/mm upstream: 28.44 downstream: 28.45
TDI P8 gaps/mm upstream 29.18 downstream 29.25
Comments 20-11-2009 17:22:00 :
Beam on both TEDs (alternate).
All clocks synchronised
Global Beam Permit true/ true
Steup Beam Flag true/ true
Beam Presence false/ false
Moveable Devices Allowed In false/ false
Stable Beams Flag false/ false
http://cdsweb.cern.ch/record/1223350